The TRM-APU60 is being developed to become the first indigenised part in KAAN's power systems. Features of the system, developed by TR Motor, generating 35kW power and high-pressure air.
Domestic solution for electric vehicles: Uninterrupted range with Werer Energy Mobile Charging Station and solar-powered We-Charge.
The turbine for the Kepez-1 hydroelectric power plant, built on the Düden River in Antalya, was manufactured in Türkiye.
AKSA generators have become the energy sponsor of the FIS Snowboard World Cup, which will be held at the ITU stadium on Saturday, December 20, 2014.








